How many bioreactors are running in parallel during a single run? For example, there are 12 or 24 bioreactors that can be operated in parallel in a single run on Ambr 250 High Throughput system
How many runs are in a typical media optimization project?
Time to complete one experiment including: setup of bioreactors, inoculation, cell cultivation, shutdown, data analysis, and planning of the next experiment
How many media samples are taken from each bioreactor during each run? Ex. Daily sampling during 14 day culture = 14 samples
How many media samples would be taken from each bioreactor during each run if time/cost was not a factor?
Total turnaround time to results of media analysis from the time of sample collection, including shipping & handling of samples to and from the lab
Per sample cost of media analysis including shipping & handling. If using in-house laboratory, enter the estimate for intercompany transfer price charged to your cost center (typical range $70-$150 at internal lab and $250-$500 at external lab)